Cart
You have no items in your shopping cart
Goodway Cooling Tower Water Basin Cleaning Package
Cooling Tower Water Basin Cleaning Package
€12.500,00

Cheaper somewhere else?

Let us know!

+31 183 216 170 [email protected]

Cooling Tower Water Basin Cleaning Package

Brand: Goodway
|
Article number: CTV-KIT-COMPLETE-A
Click to enlarge
€12.500,00 Excl. tax
€15.125,00 Incl. tax
In stock
You have got counting... hours

This complete cleaning package is made for cleaning cooling tower water basins and central collection tanks. Remove deposits without taking the cooling tower offline and reduce water waste.

More info

Information

Professional cleaning package

The complete cooling tower water basin cleaning package is specially designed to remove deposits from cooling tower water basins and central collection tanks. Think of general deposits, such as:

  • Mud
  • Silt
  • Leaves
  • Biofilm
  • Other types of (macro) deposits

Cooling towers are breeding grounds for dangerous bacteria, and no amount of water treatment can remove biological matter like the deposits described above. Only mechanical cleaning can remove this debris and sludge from basins. Without removal, this debris fouls heat exchangers and becomes a hotbed for bacterial growth like legionella.

The biggest advantages

The complete package consists of two devices, each with a number of interesting specifications. Below you will find more information.

CTV-1501 vacuum system

  • Removes deposits from the water without having to drain all the water.
  • Can be used whilst the cooling tower remains operational.
  • Powerful (variable) suction volume of up to 189 litres/minute.

CTV-F2 water filter system

  • Filter capacity of up to 5 microns.
  • Can supply the water directly back into the cooling tower, resulting in 0% water loss.
  • Simple filter system for quick deployment.

By cleaning the cooling tower water basins with Goodway equipment, deposits can be removed without having to empty the entire water content. This also means that the cooling tower can remain operational during the cleaning process. This offers numerous advantages, such as: a tremendous reduction of water (drainage and import) costs, but also time savings. With the CTV-F2 water filter system it is even possible to lose 0% water during the entire cleaning.

Scope of delivery

The Goodway Cooling Tower Water Basin Cleaning Package consists of the following products and accessories:

Customer Service

If you need further assistance, please contact our customer service to discuss the possibilities and options. You can of course always chat with our employees by starting the chat function at the bottom right of your screen!

Didn't find what you're looking for?
Let us help!
Specifications
Product
Article number:CTV-KIT-COMPLETE-A
Reviews
average of 0 review(s)
No reviews found
Read or write a review
Write a review




Advantages of this product:
Perfect for cleaning waterbasins and central collection/distribution tanks
Cooling towers can remain operational during cleaning
It is not required to drain the entire water contents
Powerful water displacement of 189 liters/minute
0% water loss during cleaning when combined with a CTV-F2 filter system